Consumption: Shower Waterproofing Kit is designed to waterproof approximately 4m², equivalent to an 800x800mm corner shower enclosure.
After installing the Shower Waterproofing Kit wait:
- 12-24 hours on absorbent substrates
- 4-5 days on substrates which are not absorbent. Lay the tiles using an adhesive from the MAPEI range (such Keraquick S1, Adesilex P9 or Keraflex Maxi S1); the width of the joints depends on the size of the tiles to be laid.
Grout the tile joints using Ultracolor Plus, Keracolor FF or with Kerapoxy or Kerapoxy CQ, available in a variety of colours Expansion joints must be sealed using either Mapesil AC or Mapesil LM silicone sealants.
Mapegum WPS:
Consistency: paste
Colour: Light grey
Density (g/cm³): 1.45
pH: 9.0
Dry solids content (%): 73
Application Data (at +23°C - 50% R.H.):
~ Application temperature range: from +5°C to +35°C
~ Waiting time between the first and second coat: approx. 60 min
~ Waiting time before installing waterproofing coating or tile finish :12-24 hours
~ Completely dry (1 mm of thickness) at +23°C: 5 hours
Shower Waterproofing Primer:
Consistency: liquid
Colour: Light blue
Density (g/cm³): 1.01
pH: 8.5
Dry solids content (%): 18
Application Data (at +23°C - 50% R.H.):
~ Application temperature range: from +5°C to +35°C
~ Waiting time between the first and second coat: approx. 30 min-2 hours**
~ Waiting time before installing waterproofing coating or tile finish: 30 min-2 hours**
~ Completely dry (1 mm of thickness) at +23°C: 5 hours
Storage: Up to 24 months in original packaging. Protect from frost.